
10 Aug
2011
10 Aug
'11
6:51 p.m.
Hi, My current production system is running 2.3.3. I've set up a test system on which I installed 3.0.9 and have imported my backup from my 2.3.3 system, did all the steps to make it working. Now, I'm doing some testing on this 3.0.9 system, but when I'll be ready for the final migration, do I have to set another server (VM in my case), or can I simply import my 2.3.3 database and just run the upgrade scripts on it? Thanks, Ugo